How Long Does a Shower Remodel Take?
An Onyx shower replacement usually takes just 1–2 days on site. Here's the full timeline from quote to install.
A common worry with any remodel is: how long will my bathroom be out of commission? With an Onyx shower system, the answer is often surprisingly short.
The Onyx Installation Timeline
Because Onyx panels are custom-manufactured to your exact measurements before installation, the on-site work is fast. A typical shower replacement takes about one to two days from demolition to finish.
What Affects the Timeline?
- Removal: Tearing out old tile takes longer than removing a fiberglass unit.
- Plumbing changes: Moving the drain or showerhead adds time.
- Custom features: Glass doors, benches, and niches require precise fitting.
- Material lead time: Your custom panels are built to order (a few weeks before install day).
The Full Process
From your free quote to final install, most projects are completed within 3–4 weeks. The actual disruption to your bathroom is usually just 1–2 days.
Want a Timeline for Your Project?
Get a free quote and we'll give you a clear schedule from quote to install.
Thinking About a Shower Upgrade?
Get a free, no-obligation quote in 24 hours. Serving all of Southern Minnesota.